Project Specs

Client:  NYSDOT

  • Historic Structure
  • 3-Span Curved, Continuous Steel Composite Girder Bridge
  • Span Lengths 164 ft., 200 ft., 121 ft.
  • Historic Truss 200 ft.
  • Culvert 10 ft. x 14 ft.

Project Details

The project included the rehabilitation of an existing 200-foot long, through-truss bridge, the design of a new 3-span curved girder bridge, the design of a large precast concrete culvert and energy dissipater along with other services required to complete this project.  The existing bridge is historic and was rehabilitated to provide access to Cattaraugus Creek for fisherman.  A paved walkway was also designed to provide access to the creek for fly fisherman, canoeists and hikers.

 Bergmann Scope:

  • Project Preliminary Design
  • Stream Hydrology & Hydraulics
  • Environmental Review
  • In-Depth Inspection & Load Rating
  • Bridge Design
  • Highway & Trail Design
  • Construction Phase Engineering
  • Community Involvement
Construction Scope:
  • $8.5M Construction Cost
  • Truss Rehabilitation & Relocation
  • Culvert & Energy Dissipater
  • Highway Construction
  • Stream Bank Reconstruction