Follow Us
Filter By
View Project
Allen Creek Railroad Berm & Pedestrian Access
Bergmann provided Design-Build services for a new culvert through an existing railroad berm to alleviate flooding issues.
Hydro Draft Tube Gate Hoist System Design
Hydro Intake Stoplogs & Hoist System Design
Hydro Powerhouse Flood Repairs
Hydro Plant Unit 1 & 2 Service and Cooling Water System Commissioning
Commissioning services at an existing two-unit hydro plant to return it's service and cooling water systems to working order.
Hydroelectric Feasibility Study for a New Generating Unit
Engineering support to complete a feasibility study to add a new generating unit
Hydroelectric Vertical Turbine Replacement
Engineering support for the replacement of a vertical Francis turbine runner by Bergmann's engineering team.
Horizontal S-Turbine Overhaul
Bergmann-provided engineering support for overhaul of a horizontal S-turbine.
North Park Lake Ecosystem Restoration
The restoration and enhancement of an aquatic ecosystem in Allegheny County.
Emsworth Dam Rehabilitation
Bergmann designed & rehabilitated two dams, two services bridges and abutments at the facility using in-the-wet technologies.
Washington Dams No. 3 & 4 Spillway Rehabilitation
Bergmann analyzed two dams in South Franklin Township as a result of a significant rainfall.
Medina Local Waterfront Revitilization Program (LWRP)
Strategic revitalization plan for the Village of Medina that focuses on its Erie Canal, Oak Orchard River and Glenwood Lake.