Follow Us
Filter By
View Project
Modernization of Interstate 75 (Segments 1 and 3) in Michigan
Bergmann provided highway design services on segments 1 and 3 of this much-needed highway modernization project.
Promenade at Erie Harbor Pedestrian Bridge & Multi-Use Trail
Promenade at Erie Harbor
Hydro Draft Tube Gate Hoist System Design
Hydro Powerhouse Flood Repairs
Hydroelectric Feasibility Study for a New Generating Unit
Engineering support to complete a feasibility study to add a new generating unit
Hydroelectric Vertical Turbine Replacement
Engineering support for the replacement of a vertical Francis turbine runner by Bergmann's engineering team.
Horizontal S-Turbine Overhaul
Bergmann-provided engineering support for overhaul of a horizontal S-turbine.
Emsworth Dam Rehabilitation
Bergmann designed & rehabilitated two dams, two services bridges and abutments at the facility using in-the-wet technologies.
North Park Lake Ecosystem Restoration
The restoration and enhancement of an aquatic ecosystem in Allegheny County.
Washington Dams No. 3 & 4 Spillway Rehabilitation
Bergmann analyzed two dams in South Franklin Township as a result of a significant rainfall.
Inghams Hydropower Dam Safety Reclassification
Reclassification of a Hydro Dam near Utica, NY
Route 240X over Cattaraugus Creek
New, realigned 3-span bridge over Cattaraugus Creek with pedestrian bridge conversion of the former historic truss.