Follow Us
Client
US Army Corps of Engineers, St. Paul District
Project Location
Devils Lake, ND
Related Markets
Pumping StationsThe City of Devils Lake, ND needed to raise the earth embankments around the lake by 5 feet to account for an anticipated increase in lake levels. Through a fast-track design for the first phase of the project, Bergmann performed an interior flood control analysis for the watershed draining to the Creel Bay and Eagle Bend Pump Stations. To protect the City, an integrated plan was then developed for a 8,500 SF pump station at East Ditch located behind the raised and relocated embankments.
2011 | Gold Star Projects Award Governmental Category - North Dakota Ready Mix & Concrete Products Association
2011 | Gold Star Projects Award Innovation Award - North Dakota Ready Mix & Concrete Products Association